Aluminium & Bi-metallic terminals – Cable preparation and crimping (best practice)
Details:
22 January 2024
10:00 AM GMT
- Aluminium oxide and its affect
- Cable preparation
- Crimping in accordance with BS7609
- Protecting the CRIMPED joint against moisture ingress
- Best practice for long term ‘palm to contact face’ performance.
Sponsored by:
Featuring:
Liquid Cooling Implementation in New and Old Data Centers
Details:
23 January 2024
10:00 AM GMT
- The systems required to liquid cool, from CDUs to Cold Plates
- Manifold systems, Rack and Facility
- Pipework considerations & leak detection
- Upgrading data centers without chilled water access or chiller capacity is reached
- Rack and Power Considerations
- Cold plates or Precision Immersion Cooling
Sponsored by:
Featuring:
Addressing Data Centre Operational Challenges through Thermal Management Technologies
Details:
24 January 2024
10:00 AM GMT
- Overview of Thermal Management Technologies available for Mission Critical Applications
- Consideration of TC 9.9 ASHRAE Guidelines & the impact on equipment selection
- Overview of DX Cooling Solutions and Free-Cooling options
- How to Optimise Chilled Water Solutions
- Overview of Indirect Evaporative Cooling Solutions
Sponsored by:
Featuring:
Best Practice Crimping of compression fittings for copper & aluminium conductors, in accordance with BS7609
Details:
25 January 2024
10:00 AM GMT
- Material composition & how they differ
- Cable preparation and insertion
- Using a matched crimping system
- Correct number compressions and the sequence in which they are applied
- Post inspection of the crimped joint
Sponsored by:
Featuring:
More about this event
Aluminium & Bi-metallic terminals – Cable preparation and crimping (best practice)
Sponsored by:
Topics discussed in this session:
- Aluminium oxide and its affect
- Cable preparation
- Crimping in accordance with BS7609
- Protecting the CRIMPED joint against moisture ingress
- Best practice for long term ‘palm to contact face’ performance.
More about this event
Liquid Cooling Implementation in New and Old Data Centers
Sponsored by:
Topics discussed in this session:
- The systems required to liquid cool, from CDUs to Cold Plates
- Manifold systems, Rack and Facility
- Pipework considerations & leak detection
- Upgrading data centers without chilled water access or chiller capacity is reached
- Rack and Power Considerations
- Cold plates or Precision Immersion Cooling
Speakers
More about this event
Addressing Data Centre Operational Challenges through Thermal Management Technologies
Sponsored by:
Topics discussed in this session:
- Overview of Thermal Management Technologies available for Mission Critical Applications
- Consideration of TC 9.9 ASHRAE Guidelines & the impact on equipment selection
- Overview of DX Cooling Solutions and Free-Cooling options
- How to Optimise Chilled Water Solutions
- Overview of Indirect Evaporative Cooling Solutions
More about this event
Best Practice Crimping of compression fittings for copper & aluminium conductors, in accordance with BS7609
Sponsored by:
Topics discussed in this session:
- Material composition & how they differ
- Cable preparation and insertion
- Using a matched crimping system
- Correct number compressions and the sequence in which they are applied
- Post inspection of the crimped joint